Pacific Play Systems recently finished a new outdoor play and learning space at the Point Loma Child Development Center in San Diego. The project, at 4785 N. Harbor Drive, serves children of military families and is part of the U.S. Navy’s effort to expand childcare capacity. We started in October 2025 and wrapped up in April 2026.

The finished play area, with shade over the equipment and poured-in-place surfacing underneath.

More Than a Playground

We didn’t treat this as one playground. We planned it as a full outdoor environment, with separate play areas for infants, toddlers, and preschoolers. Each area is built around what that age group actually needs, and the whole space still feels like one connected yard.

Niloofar Bigonah, one of our project managers on the job, put it this way: “One of the most rewarding aspects of this project was designing each play area around the unique developmental needs of infants, toddlers, and preschoolers while ensuring the entire outdoor environment felt connected, inviting, and accessible.”

Smaller-scale equipment in one of the younger-age areas.

Shade Over at Least Half the Space

Shade was the biggest design challenge. The project called for shade coverage over at least 50% of the area, and a single type of structure wasn’t going to get us there. We combined freestanding shade structures with integrated canopies, and the finished space clears that 50% mark. Kids and caregivers both get a more comfortable place to be on a sunny San Diego day.

Freestanding shade structures over the play areas.

Freestanding shade structures over the play areas.

Digging Deep Near the Coast

The install had its own surprises. Some of the shade footings had to go about 12 to 13 feet deep. With the site so close to the coast, we hit groundwater at roughly 10 feet below grade.

Open excavations in that kind of ground want to fill with water and cave in. We used slurry to stabilize the holes, then re-excavated the footings so water and loose soil stayed out while the structures went in. It added steps, but it kept the footings solid.

Color That Does Some Work

Bright poured-in-place rubber surfacing ties the play areas together. The patterns and colors give kids something to follow and invent games around, and the surface itself adds safety and accessibility across the site.

Poured-in-place surfacing with bright patterns.
Poured-in-place surfacing with bright patterns.

Built for the Long Run

Salina Tuladhar, our project manager, said the team took real pride in this one: “Knowing this playground will serve military families and the community for many years to come makes this project especially rewarding for our team.”

Planning a Play Space for Your Site?

We design and install commercial playgrounds for schools, childcare centers, cities, and military facilities across Southern California. If you’re thinking about a new space or an upgrade, call or email us for a free consultation.

Ask for your free Playground Consultation

Call us or email to discuss your playground needs, including climbing boulders and rope play structures, and get started on your project.

Contact Us - 760-599-7355

Skip to content